Testimonials‎ > ‎

Road Building

posted Feb 7, 2020, 1:15 PM by Brian Grenier   [ updated Feb 7, 2020, 1:37 PM ]
Holder with Packer and Mower
I built two roads or Driveways the summer of 2019 and hauled gravel to another project.

For Mike and Olga, I cleared 150 mature birch with the tree harvester and grubbed and smoothed pad and constructed 700' of Driveway. WE will let the driveway set over the winter and evaluate how much dry material to bring in.



For Brandon, I cleared mostly black spruce with excavator, pushing trees down for speed and buried a lot of the trees and using excavated material out and along the new drive. Total distance is about 520 yards.
Comments